Saturday, April 28, 2012
Gear doors installed
WOW
4/27/12 - Silver painting completed. Everyone jumps in and
begins to remove the masking paper and plastic from
the engines, props and glass.
4/25/12 - Painting of the wings and engines begin.
single click photos to enlarge.
Friday, April 20, 2012
APU installed in the plane.
Thursday, April 19, 2012
New Pilot and Co-Pilot seat cushions.
April 18, 2012 - The silver starts to flow.
Saturday, April 7, 2012
Left wing attached.
With the wing tips on, the plane is ready for scuffing,
tac and painting.
Tuesday, April 3, 2012
April 3, 2012 -- Right wing tip has been attached.
April 3, 2012 -- The restoration hangar has been cleared and
the B-29 has been rotated 180^ and centered
in the hangar. The wing tips are ready to attach.